ENGITECH has designed, developed and installed the New Control and Management System for the Ferre Heating Treatments System in line with the NADCAP requirements.
The development project cycle involved Reverse Engineering Activities for system drive logic and design, development and installation of the New Control Architecture and Plant Management.
The New System presents the following features: