Customer: HITACHI RAIL

 

ENGITECH carries out, at the HITACHI RAIL site in Reggio Calabria, the activities of Assembly and Box Set-up for the FNM (Ferrovie Nord Milano) order and in particular:

  • WINDOW ASSEMBLY
  • MONT. STRUCTURAL PARTS
  • STAIRS ASSEMBLY
  • CASE SEALING DM
  • WINDSHIELD GLUING
  • IMP. WATER TOILET
  • RAIN CH. AND SUPP. PAV.
  • TOILET ASSEMBLY
  • VTR HEAD SEALING
  • ELECTRIC CHANNELS ASSEMBLY
  • AIR CHANNELS ASSEMBLY
  • ASSEMBLY OF SEATS, CARTER AND MAT
  • FLOOR AND THRESHOLD ASSEMBLY