ENGITECH carries out, at the Reggio Calabria site, the activities of Assembly and Box fitting for the ROCK FNM (Ferrovie Nord Milano) order and in particular:
- Installation of windows, door thresholds, low stairs, large stairs
- Seals
- Floor Structures Ass
- Windshield panel assembly

- FWP Tank Installation, WNT Waste Tank Installation
- Internal water system installation, water connections
- CH Rain Drain Ass., Chanel Rain Mounting, Door Pocket Brackets
- Pre-assembly, Floor Assembly
- Cont. isol.
- HK Toilet Assembly and STB Toilet Assembly
- Resin Head Sealing
- Assembly of internal box channels and internal cabins
- HUAC Air Duct Assembly
- Seat Pre-assembly and Seat Assembly
- Upper rail cover assembly
- IGM switchboards assembly
- Assembling Bike Racks, Luggage, Strap Ones, Mobile Ramp
- Floor Integration Assembly
- Sandbox load
- Ungibordo tanks